File:WB Tower. Westbound tower pedestal under construction, May 10, 2021.jpg: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 May 2021

  • curprev 18:0018:00, 11 May 2021HistoryCommission2 talk contribs 593 bytes +24 No edit summary
  • curprev 18:0018:00, 11 May 2021HistoryCommission2 talk contribs 569 bytes +569 Steel-rebar being knotted together for the sturdy.concrete base of the WB tower, when it is relocated to the site of the B&O Railroad YMCA on East Potomac Street. CSX's WB (West Brunswick) tower in Brunswick, Maryland closed on December 9th, 2011 after a career spanning a full century of service on the B&O Main Line between Baltimore (or Washington) and Pittsburgh (or Wheeling). It also had the distinction of being the last manned interlocking tower on the B&O Main where scarcely more than 1...